Thank you for visiting nature.com. You are using a browser version with limited support for CSS. To obtain the best experience, we recommend you use a more up to date browser (or turn off compatibility mode in Internet Explorer). In the meantime, to ensure continued support, we are displaying the site without styles and JavaScript.

Scientific Reports volume  13, Article number: 13655 (2023 ) Cite this article partial discharge monitoring

Various overvoltage mitigation schemes were used in literature in suppression of switching overvoltages in wind farms. However, the evaluation of how the effectiveness of these mitigation techniques would vary with the change of the wind farm topology is still un-explored territory. The main aim of this paper is to study the effectiveness of four mitigation schemes while using SF6 circuit breaker namely; R–L smart choke, R–C snubber circuit, surge capacitor and pre-insertion resistor (PIR) were studied in four different wind farm topologies; radial, single-sided ring, double-sided ring and star topologies. The topologies were based on a real wind farm located in Zaafrana, Egypt. The results showed that R–L choke to be the most effective scheme for all topologies followed by PIR, R–C snubber and surge capacitor schemes respectively. Their percentage of reduction of overvoltage ranged from 62 to 84% for R–L choke, 33–67% for PIR, 8–25% for R–C snubber circuits and 4–15% for surge capacitors. Also, it was shown that the change of the wind farm topology didn’t affect the order of effectiveness of the mitigation schemes such that R–L remained the most effective and surge capacitor the least effective for all topologies.

The dual sided problem arising from the vast scale of the energy market due to the increasing demand for electric power in addition to the diminishing supply for the reserve fossil fuel has led to a fast track reliance on renewable energy sources. One of the main sources that has been utilized globally is wind energy leading to excessive investigation into the performance and protection wind farms. However, the structure of wind farms differs from conventional power stations in employing huge numbers of power transformers, underground cables that extend for long distances and control algorithms that mandate frequent switching operations1. Generally, wind farms constitute of several electrical and mechanical elements such as wind towers, turbines, underground cables, transformers, and protection devices. The connections between these elements could be built in various topologies with four main widely known topologies namely; topologies are Radial topology, Single-Sided Ring (SSR) topology, Double-Sided Ring (DSR) topology, and Star topology2.

The frequent switching induces a transient overvoltage whose destructive effect is amplified by the presence of power transformers and the MV cables which forms a resonant RLC circuit3. This destructive effect has led to insulation failures in wind farms4. The consequent losses due to theses failures have lead researchers to investigate the impact of transient overvoltages in wind farms5,6,7. The highlights of the literature regarding the study of the impact of overvoltages in wind farms and the suppression measures employed to mitigate the overvoltages are summarized in Table 1. The main focus of the survey was upon recent papers within the last five years. For such reason, the table scans most papers within years 2019 up to 2023 with a total of 18 publications in the recent five years and 3 publications in earlier years.

The table shows the diverse topics studied in literature in regards of the transient analysis within wind farms. However, the impact of selecting the most suitable suppression technique with respect to the wind farm topology was not investigated before. Such topic is highly important as the degree of severity of the switching overvoltages (SOV) depends mainly on the wind farm topology3,19,20. Therefore, the main problem that this paper aims to address is to investigate the most suitable suppression measure for each wind farm topology. Thus, the contributions of this paper will be:

Studying and investigating the impact of different wind farm topologies (radial, DSR, SSR and star) upon the transient SOV. Such comparison was rarely covered in literature with few publications as reference 3 only covering this point.

Performing simulations to reach for the most suitable suppression technique for each wind farm topology with that particular contribution not investigated before in literature.

Presenting conclusions based on the presented results which can be used by researchers for selection the optimal suppression measures based upon network topology. The results showed the R–L choke coil to be the most effective suppression measure in reducing SOV with a percentage of reduction in amplitude of SOV of 62–84%.

The rest of this paper is organized as follows. In “System under study” section presents the system under study. In “Modeling of the system” section discusses the modeling methodologies used for different elements within the system. Simulation results are presented for each wind farm topology in “Simulation results” section. The results of “Discussion and effectivity analysis” section are discussed in “Discussion and effectivity analysis” section showing the main features for selecting the suitable suppression method for each topology. Finally, conclusions are drawn in Sect.  Conclusions.

The circuit breakers used in this study are SF6 circuit breakers which could be modeled using several approaches with two most famous modeling blocks used known as Mayr’s and Cassie models. Both models are discussed in the next subsections.

The approach used in Mayr’s model depends upon using dynamic analysis for the arc which defines the breakers ability to reach successful opening28. The main variable computed with the arc analysis is the conductance of the arc. During the opening process, the arc goes through four stages that represent the transition process of the breaker from certain state to another. These stages are closed breaker, arcing, arc extinguishing and open stages29,30. For the first stage that represents closed breaker and last stage that represents open breaker, the breaker is represented as a constant resistor of negligibly small value of 1 μΩ and high value of MΩ respectively. For the remaining transition stages, a series connection could be deduced as follows29,31.

During the arcing stage, an imbalance arises in between the heating power from the arc \({(\mathrm{P}}_{\mathrm{H}})\) and the cooling power due to the dissipation of the energy from the arc \({(\mathrm{P}}_{\mathrm{o}})\) . The difference between both energies is stored within the arc column Q(t) as given in (1)

The energy stored in arc Q(t) is used to define the conductance \({\mathrm{g}}_{\mathrm{m}}\left(\mathrm{t}\right)\) as given in (2) where τ is the arc time constant.

The given expression in (1) could re-defined in terms of the arc conductance as given in (3).

(2) could be substituted in (3) while considering the heating power equal to the amount of electrical power from the arc (v \(\times\) i), where v is the arc voltage and i is the arc current resulting in Eq. (4)

Finally, the conductance \({\mathrm{g}}_{\mathrm{m}}=\mathrm{v}/\mathrm{i}\) could be used in (4) to get (5).

The modeling of the SF6 interrupter into ATP/EMTP environment is done by the MODELS component. That component allows the user to build a coded program integrates its programming with the simulated electrical system.

The modeling of the transmission lines was done by the frequency-dependent model of the transmission lines with their parameters as given in Table 2. While for cables and feeders, the frequency-dependent cable model used with their lengths as given in previous section.

The frequency-dependent transformer model is used to account for the nonlinearities when studying the transformer’s energization. For transient analysis, the effect of the stray capacitance is crucial to be considered. For such reason, the stray capacitances between each winding and the ground and the capacitance between the two windings of the main transformers were simulated using capacitive elements connected across transformer component upon ATP3,32.

The generation system within the wind turbine consists of different devices including the generator, gearbox, rectifier, three-phase inverter, and other components. Since the main focus of this research is the response from the switching circuit breaker, a 5 MW, 690 V synchronous generator model is used. The leakage reactance of the generator is 0.1 H32.

The circuit breaker switch S1 shown in Fig. 1a for radial topology was suddenly opened at t = 10 ms. The results of the arising switching transient overvoltage is shown in Fig. 2a. The PIR was connected in parallel with S1 and effectively reduced the overvoltages as shown in Fig. 2b. Sequentially, the PIR was removed R–C snubber circuit was connected in parallel with resulting transient overvoltages shown in Fig. 2c. The same sequence was done for the smart choke and surge capacitor whose results are shown in Fig. 2d,e respectively. The peak values recorded for each phase in each mitigation scheme are presented in Table 3. The results show that R–L smart choke was the most effective scheme in reducing switching overvoltages. Further discussion and analysis of the results are presented in the next section. To Further elaborate the impact of R–L choke upon the resulting SOV, the values of R and L such that the value of R was increased to 100 Ω while keeping L constant at 1.5 mH, then the value of L was increased to 2 mH while keeping R constant at 50 Ω. The resulting SOV was recorded for each case. The results of SOVs with new R an L are presented in Table 4. The results show that the minimal SOV was for R = 50 Ω and L = 1.5 mH.

Switching overvoltage across circuit breaker S1 in radial topology.

The same sequence of the previous section will be undergone for this section for single sided ring topology such that circuit breaker switch S1 was opened at t = 10 ms. The results of the arising switching transient overvoltage without mitigation, with PIR, RC-snubber, smart choke and surge capacitor shown in Fig. 3a–e respectively. The peak values of the switching transients per phase are presented in Table 5. The results show that R–L smart choke was the most effective scheme in reducing switching overvoltages as in previous case. As in previous topology, the impact of R–L choke upon the resulting SOV was investigated by changing the values of R and L as presented in Table 6. The results show that the minimal SOV was for R = 50 Ω and L = 1.5 mH.

Switching overvoltage across circuit breaker S1 in single-sided ring topology.

The results of the arising switching transient overvoltage across S1 in double sided ring topology of Fig. 1c in case no mitigation used, with PIR, RC-snubber, smart choke and surge capacitor shown in Fig. 4a–e respectively. The peak values of the switching transients per phase are presented in Table 7. In the same manner as in previous topologies, the values of R and L were changed as presented in Table 8. The results show that the same conclusion as in previous topologies which is the minimal SOV was for R = 50 Ω and L = 1.5 mH.

Switching overvoltage across circuit breaker S1 in double-sided ring topology.

The results for the switching transient overvoltage across S1 in star topology of Fig. 1d in case no mitigation used, with PIR, RC-snubber, smart choke and surge capacitor shown in Fig. 5a–e respectively. The peak values of the switching transients per phase are presented in Table 9. In the same sequence for R and L testing was done for this topology as in previous topologies as presented in Table 10. The results show that the same conclusion as in previous topologies.

Switching overvoltage across circuit breaker S1 in star topology.

To evaluate the effectivity of each mitigation scheme used, the amount of reduction in switching overvoltages was computed. For radial topology, the transient overvoltage of phase A reached a peak value of 17.6 kV without any mitigation technique used. That value was reduced to 6.6 kV for the same phase when PIR was used. Hence, the percentage of the reduction in the switching overvoltage in this case is 62.32% with respect to the unmitigated original overvoltage of 17.6 kV. The percentage of reduction for phase A for each mitigation scheme and in each topology are shown in Fig. 6a. Similarly, for phases B and C in Fig. 6b,c respectively. The results show that smart choke R–L was the most effective scheme for all topologies. That effectiveness was monitored from the percentage of overvoltage that reached 84.7% in case of single sided ring topology and ranged from 62 to 73% in other topologies. The remaining schemes could be arranged in order of their effectivity as PIR, R–C snubber and surge capacitor respectively. The PIR, R–C snubber and surge capacitor had a percentage reduction ranging from 33 to 67%, 8 to 25% and 4 to 15% respectively. It could be noticed also, that the order of effectiveness of mitigation schemes remained the same for all topologies.

Percentage of reduction in switching overvoltages due to different mitigation schemes in each topology.

The effect of increasing the feeder length was also investigated by increasing the length of feeder F1 from 8 to 10 km and 12 km. The increase in feeder length did reduce the switching overvoltage but that reduction was very limited as shown in Fig. 7. The figure shows the level of switching overvoltage for each topology for feeder F1 of 8 km, 10 km and 12 km. it could be seen from the figure that the impact of the feeder length was very limited.

The transient overvoltage in each topology for different lengths of feeder F1.

The expanding utilization of wind farms and their various topologies has mandated the study of the effectiveness of the different overvoltage suppression schemes within each topology. In this study, four different topologies were selected, radial, single sided ring, double sided ring and star topologies. For each topology, the simulation tests showed a significant transient overvoltage showing during the switching of the circuit breaker. To suppress these overvoltages, four different mitigation schemes including pre-insertion resistor (PIR), RC-snubber circuit, R–L choke coil and surge capacitor.

To evaluate the effectiveness of each mitigation scheme, the percentage of reduction in transient overvoltage was computed in each case. The percentage of reduction in switching overvoltage showed the R–L choke coil to be the most effective mitigation scheme with percentage of reduction ranging from 62 to 84%. The PIR, R–C and snubber had a percentage reduction ranging from 33 to 67%, 8 to 25% and 4 to 15% respectively. It could be concluded that the effectiveness of the schemes could be arranged in order of their effectiveness as R–L choke coil, PIR, R–C snubber and surge capacitor respectively. Additional investigation showed the value of R for the choke coil to be highly effective at 50 Ω. The inductance of the choke coil showed high effectiveness at 1.5 mH. The previous R–L values showed a 62–84% which were the highest percentage of reduction among all mitigation measures. Also, it was noticed that changing the wind farm topology did not affect the previous order of effectiveness of mitigation schemes.

The data that support the findings of this study are available from the corresponding author upon reasonable request.

gm Conductance of the arc

PH Heating power of arc

Energy stored into the arc

Holdyk, A., Holbøll, J., Koldby, E., & Jensen, A. Influence of offshore wind farms layout on electrical resonances. In Proceedings of Cigre Session 45, Paris, France (2014).

Manwell, J. F., McGowan, J. G. & Rogers, A. L. Wind Energy Explained, Theory, Design and Application (Wiley, 2010).

Elshahed, M., Ragab, A., Gilany, M. & Sayed, M. Investigation of switching over-voltages with different wind farm topologies. Ain Shams Eng. J. 12(3), 2695–2707 (2021).

Sweet, W. Danish wind turbines take unfortunate turn. IEEE Spectr. 41(11), 30–34 (2004).

Abdulahovic, T. & Thiringer, T. Voltage stress in a transformer winding during very fast transients caused by breaker closing event. IEEE Trans. Power Deliv. 29(4), 1946–1954 (2014).

Liljestrand, L., Sannino, A., Breder, H. & Thorburn, S. Transients in collection grids of large offshore wind parks. Wind Energy 11, 45–61 (2008).

Abdulahovic, T. Analysis of high frequency electrical transients in offshore wind parks. In Dep. Energy and Environment. vol. MSc: Chalmers University of Technology (2009).

Sun, Q. et al. Investigation on reignition probability of switching overvoltage caused by vacuum circuit breaker in offshore wind farms. IEEE Trans. Power Deliv. 37(5), 4438–4447 (2022).

Xin, Y. et al. Development of improved suppression measures against reignition overvoltages caused by vacuum circuit breakers in offshore wind farms. IEEE Trans. Power Deliv. 37(1), 517–527 (2021).

Xin, Y. et al. Configuration of suppression schemes against high-frequency transient reignition overvoltages caused by shunt reactor switching-off in offshore wind farms. Int. J. Electr. Power Energy Syst. 141, 108170 (2022).

Zhou, J., Xin, Y., Tang, W., Liu, G. & Wu, Q. Impact factor identification for switching overvoltage in an offshore wind farm by analyzing multiple ignition transients. IEEE Access 7, 64651–64662 (2019).

Said, A., Ezzat, M., Abd-Allah, M. A., Fouda, M. M. & Abouelatta, M. A. Optimization-based on mitigation techniques of the temporary overvoltage in large offshore wind farm. IEEE Access 11, 6320 (2023).

Ghasemi, S., Allahbakhshi, M., Behdani, B., Tajdinian, M. & Popov, M. Probabilistic analysis of switching transients due to vacuum circuit breaker operation on wind turbine step-up transformers. Electr. Power Syst. Res. 182, 106204 (2020).

Geng, Y. et al. Three-phase modeling of 40.5-kV vacuum circuit breaker switching off shunt reactors and overvoltage suppression measure analysis. Electr. Power Syst. Res. 194, 107058 (2021).

Akinrinde, A., Swanson, A. & Davidson, I. Investigation and mitigation of temporary overvoltage caused by de-energization on an offshore wind farm. Energies 13(17), 4439 (2020).

Xin, Y. L., Tang, W. H., Zhou, J. J., Yang, Y. H. & Liu, G. Sensitivity analysis of reignition overvoltage for vacuum circuit breaker in offshore wind farm using experiment-based modeling. Electr. Power Syst. Res. 172, 86–95 (2019).

Li, Y. et al. Over-voltage suppression methods for the MMC-VSC-HVDC wind farm integration system. IEEE Trans. Circuits Syst. II Express Briefs 67(2), 355–359 (2019).

Kafshgari, N. A., Ramezani, N. & Nouri, H. Effects of high frequency modeling & grounding system parameters on transient recovery voltage across vacuum circuit breakers for capacitor switching in wind power plants. Int. J. Electr. Power Energy Syst. 104, 159–168 (2019).

Zhang, T., Sun, L. & Zhang, Y. Study on switching overvoltage in off-shore wind farms. IEEE Trans. Appl. Supercond. 24, 1–5 (2014).

Villar, F., Reza, M., Srivastava, K., & Da Silva, L. High frequency transients propagation and the multiple reflections effect in collection grids for offshore wind parks. In IEEE Power and Energy Society General Meeting, Detroit, MI (2011).

Chennamadhavuni, A., Munji, K. K., & Bhimasingu, R. Investigation of transient and temporary overvoltages in a wind farm. In Auckland: Power System Technology (2012).

Zheng, Z. et al. Investigation on overvoltage caused by vacuum circuit breaker switching off shunt reactor in offshore wind farms. High Voltage 7(5), 936–949 (2022).

Guo, Y. et al. Reignition overvoltages induced by vacuum circuit breakers and its suppression in offshore wind farms. Int. J. Electr. Power Energy Syst. 122, 106227 (2020).

Sun, Q. et al. Investigation on multiple reignitions caused by vacuum circuit breaker switching off shunt reactor considering contact travel in offshore wind farms. IEEE Trans. Power Deliv. 38, 2360 (2023).

Tao, J. et al. Switching transients caused by vacuum circuit breakers in collection grids of offshore wind farms. Wind Energy 24(12), 1501–1516 (2021).

Pu, Z., Liu, H., Wang, Y., Yu, X. & Wu, T. Simulation and protection of reignition overvoltage in wind farm considering microscopic dielectric recovery process of vacuum circuit breaker. Energies 16(4), 2070 (2023).

Zhou, Z. et al. Study on transient overvoltage of offshore wind farm considering different electrical characteristics of vacuum circuit breaker. J. Mar. Sci. Eng. 7(11), 415 (2019).

Gouda, O. E., Awaad, M. I. & Afifi, Z. E. Impact of superconducting current limiter on the gaseous HVDC circuit breakers characteristics. Electr. Power Syst. Res. 199, 107442 (2021).

Badran, E. A., Abd-Allah, M. A., Hamza, A. H. & Elyan, T. A proposed transient recovery voltage mitigation technique for generator-circuit-breaker fed faults. J. Electr. Syst. 9(1), 66–72 (2013).

Bizak, G., Zunko, P. & Povh, D. Combined model of SF6 circuit breaker for use in digital simulation programs. IEEE Trans. Power Deliv. 19(1), 174–180 (2004).

Gouda, O. E., Amer, G., Awaad, M. & Ahmed, M. Cascaded HVDC gaseous circuit breaker performance using black box arc model. Electr. Eng. 103(2), 1199–1215 (2021).

Abouelatta, M. A., Ezzat, M., Abd-Allah, M. A. & Said, A. Analysis and mitigation of the lightning overvoltage in capacitively coupling grid connected offshore wind turbine. Int. J. Electr. Eng. Inform. 14(2), 443–464 (2022).

Xin, Y., Liu, B., Tang, W. & Wu, Q. Modeling and mitigation for high frequency switching transients due to energization in offshore wind farms. Energies 9(12), 1044 (2016).

Ebrahim, M. A., Elyan, T., Wadie, F. & Abd-Allah, M. A. Optimal design of RC snubber circuit for mitigating transient overvoltage on VCB via hybrid FFT/Wavelet Genetic approach. Electr. Power Syst. Res. 143, 451–461 (2017).

Smugala, D. et al. Wind turbine transformers protection method against high-frequency transients. IEEE Trans. Power Deliv. 30, 853–860 (2015).

Smugała, D. et al. New approach to protecting transformers against high frequency transients—wind turbine case study. Prz. Elektrotech. 89, 186–190 (2013).

Open access funding provided by The Science, Technology & Innovation Funding Authority (STDF) in cooperation with The Egyptian Knowledge Bank (EKB).

Faculty of Engineering at Shoubra, Benha University, Cairo, 11629, Egypt

Department of Electrical Power & Machines Engineering Department, The Higher Institute of Engineering at El-Shorouk City, Alshorouk Academy, Cairo, 11837, Egypt

Mechatronics and Robotics Engineering Department, Faculty of Engineering, Egyptian Russian University, Badr City, Egypt

You can also search for this author in PubMed  Google Scholar

You can also search for this author in PubMed  Google Scholar

T.A. and F.W. have participated in (a) conception, analysis and interpretation of the data and (b) drafting the article or revising it critically for important intellectual content.

The authors declare no competing interests.

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

Open Access This article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons licence, and indicate if changes were made. The images or other third party material in this article are included in the article's Creative Commons licence, unless indicated otherwise in a credit line to the material. If material is not included in the article's Creative Commons licence and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this licence, visit http://creativecommons.org/licenses/by/4.0/.

Eliyan, T., Wadie, F. Evaluation of the efficacy of transient overvoltages suppression measures in different wind farm topologies using SF6 circuit breaker. Sci Rep 13, 13655 (2023). https://doi.org/10.1038/s41598-023-40768-4

DOI: https://doi.org/10.1038/s41598-023-40768-4

Anyone you share the following link with will be able to read this content:

Sorry, a shareable link is not currently available for this article.

Provided by the Springer Nature SharedIt content-sharing initiative

Scientific Reports (Sci Rep) ISSN 2045-2322 (online)

ground loop impedance tester Sign up for the Nature Briefing newsletter — what matters in science, free to your inbox daily.