ARLINGTON, Wash. — Drivers heading north on Interstate 5 approaching the Stillaguamish River experienced traffic delays as an expansion joint closed all but one lane of the freeway.
At 7:21 p.m. on Monday, The Washington State Patrol (WSP) announced on their X account that an expansion joint had come loose and was sticking up in the roadway. 1-10mm Rubber Sheet
🚨 Traffic alert. An expansion joint at the Stilly River on northbound Interstate 5 (MP 209) has come loose and is sticking up in the roadway. Backups are already long. Only one lane open. Seek alternate routes. DOT is on the way to fix the expansion joint. WP pic.twitter.com/as8nZl4NV0
This occurred near milepost 209 in Arlington.
Northbound traffic was reduced to two lanes until the Washington State Department of Transportation (WSDOT) arrived to make repairs.
Drivers were advised to find alternate routes as the backup reached nearly 3 miles at one point.
According to WSP, a few cars hit the expansion joint but no injuries were reported.
WSDOT crews have reduced northbound I-5 to one lane as repairs are being made.
Reducing Pipe Repair Rubber Air Bag © 2024 Cox Media Group. This station is part of Cox Media Group Television. Learn about careers at Cox Media Group. By using this website, you accept the terms of our Visitor Agreement and Privacy Policy, and understand your options regarding Ad Choices.